Skip to content

Elvira Badaracco Foundation – Women’s Studies and Documentation ETS

Support us
  • It
  • En
Fondazione Badaracco Logo
  • The Foundation
  • Archives
  • Library
  • Digital exhibitions
  • Projects
  • Pubblications
    • Book series
    • Volumes
  • News
  • Search
Search
Home » Figures of Women. Sixteenth-Century Literary Texts: Sources, Writings, Critical Pathways
Figures of Women. Sixteenth-Century Literary Texts: Sources, Writings, Critical Pathways
admin2026-07-30T11:20:30+02:00
Support the Elvira Badaracco Foundation with a donation or by designating your 5 per mille in your tax return
Support us
Elvira Badaracco Foundation Logo

The Fondazione Elvira Badaracco – Women’s Studies and Documentation ETS aims to promote the study of women’s culture and political and social experience, with specific attention to the history of women’s associations and feminism.

Opening Hours
Monday and Tuesday: 9:30 AM – 2:00 PM
Wednesday and Thursday: 9:30 AM – 4:00 PM
Contact

Fondazione Elvira Badaracco
Women’s Studies and Documentation ETS
Via Menabrea, 13
20159 Milano -MI-

For consultations by appointment
call our phone number or contact us

tel: 02 29005987
email: info@fondazionebadaracco.it

Subscribe to our newsletter

© 2026 Fondazione Elvira Badaracco – Women’s Studies and Documentation ETS – C.F.: 11398560158

Privacy Policy(function (w,d) {var loader = function () {var s = d.createElement("script"), tag = d.getElementsByTagName("script")[0]; s.src="https://cdn.iubenda.com/iubenda.js"; tag.parentNode.insertBefore(s,tag);}; if(w.addEventListener){w.addEventListener("load", loader, false);}else if(w.attachEvent){w.attachEvent("onload", loader);}else{w.onload = loader;}})(window, document);
Page load link
Go to Top